The tallies are in, and… shit’s not cheap, yo

Finally did the tallies for the entire deed redesign, and here are the results. From the highest to the lowest;
————————–
(none of these values are covering the cost of Ground tiles)
2,453 Planks(double of what I needed to redesign OR for the final time)
1,302 Stone Bricks (I could buy half and then make the other half)
846 Clay (includes Mortar-making. Need to figure out how much Clay I’ll need without needing Mortar)
520 Mortar (purchase it, of course. Two large crates worth. I’ll try to do a crate swap by giving them two of my empty crates)
420 Mixed Grass
329 Small Nails
326 Wooden Beams
270 Shafts
240 Sandstone Bricks & Wood Shingles
210 Wood Scraps (to relocate the farm)
120 Large Nails
102 Iron Fence Bars (extending the exterior fence that wraps around the deed’s border)
58 Iron Ribbons (to make the bridges)…
…and finally, 3 Slabs for the stone benches

As you can see, this is no easy task, and will likely take up to a month to complete. Just to make one thing clear, I knew I was going to need a Knarrload of resources, but it’s not the reason why I’ve been procrastinating). Minecraft was the reason.
Anyway, today (or maybe tomorrow), I think I’m going to try to buy that 520 Mortar, and the half of the 1,302 Bricks I’ll need (651 Bricks I’ll have to purchase (and make the other half)).
The biggest headache of course(if you couldn’t tell by that staggering number), is gonna be the planks. But I feel with enough patience, I should be able to do it myself (plus it should help me reach Master Carpenter). I could just make half (which is what I did when it came to OR) and then make the other half later.

Well that’s about it. Wish me luck for good, reasonable deals (and of course favorable winds).

This entry was posted in PC. Bookmark the permalink.