I’ve been working on planning that new road I’ve had my eyes on for awhile. It’ll be attached to the secondary path up to my settlement.
Unfortunately, this is hard as hell. I’m dealing with 90+ slopes and having no idea how many dirts I have to dig into the side of the hill to lower all slopes to 20.
This will not be a repeat of my failed idea several years ago back in JK-H which started my Homestead hunt. I’ll get this. It’ll just take more time than I hoped it would.
Only thing that seems to be working is digging down from the very top.
Another idea I’m planning to do is staring at the 90+ slope ahead of me, climbing up it and then start digging away at the slope behind it to make it flat, to give myself something to “lean against” as I slowly hack away at the 90+ slopes to get them down to 20.
No doubt I’m possibly looking at over 600 dirts having to be removed, and then some. And that’s just to get it up the hill. Once up I have to determine in tiles how far away the peat is, to the south of me. This actually will be the easy part.. IF there’s no huge hills to the east of the road.
Once that’s done and the cobblestone is laid for the entire distance of the new road, I have to make a few directional signs to point to my settlement.